2025 Implementation Trip
Our 2025 construction included installation of about 2 km of HDPE pipe from water sources in Binana to the tank at the Murago school. This route spanned over 200m elevation drop. Therefore, a masonry break tank was constructed to break pressure and expose water to atmospheric pressure. The pipe route also involved crossing a small river, which utilized a casing pipe as a structural bridge. The pipeline also tapped into a tap stand in the Busoro community along the way, to provide water to more people.